Laserfiche WebLink
Technical Memorandum  <br />Solution Collection Piping Modifications  <br />NewFields Job No. 475.0106.006  <br />August 22, 2016  <br />  <br />  <br />  <br />Page 4  <br />FIGURE 3 – SQUAW GULCH VALLEY LEACH FACILITY – PIPE BENCH DETAIL  <br />  <br />  <br />In order to assess potential areas where solution may escape containment, NewFields reviewed  <br />the geomembrane placement and tie‐in locations shown in the Mill Site Earthworks and Squaw  <br />Gulch  Valley  Leach  Facility  drawing  sets.    As  shown  below  on  Figure 4 Drawing A160  <br />Containment Berm Plan and Profile, and Figure 5, the geomembrane was anchored on the top  <br />of the containment berm at an approximate elevation of 9889’ around the mill platform.