My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (24)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:51:42 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Laboratory Test Results
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement of Hydraulic Conductivity of <br />Saturated Porous Material Using a <br />Flexible Wall Permeameter <br />(ASTM D5084-00) <br />AVERAGE PERMEABILITY cm/sec <br />INITIAL LENGTH OF SPECIMEN 7.30 cm <br />INITIAL DIAMETER OF SPECIMEN 7.29 cm <br />INITIAL WATER CONTENT 14.2 % <br />INITIAL DRY UNIT WEIGHT 115.2 pcf <br />INITIAL VOLUME 304.7 cu.cm <br />PERMEANT LIQUID <br />MAGNITUDE OF TOTAL BACK PRESSURE 50.0 psi <br />EFFECTIVE CONSOLIDATION STRESS 5.0 psi <br />RANGE OF HYDRAULIC GRADIENT USED 13.8 6.3 <br />FINAL LENGTH OF SPECIMEN 7.28 cm <br />FINAL DIAMETER OF SPECIMEN 7.28 cm <br />FINAL WATER CONTENT 15.4 % <br />FINAL DRY UNIT WEIGHT 115.9 pcf <br />FINAL VOLUME 303.0 cu.cm <br />DEGREE OF SATURATION (BEFORE AND AFTER TEST)85%94% <br />SPECIFIC GRAVITY USED IN CALCULATIONS OF SATURATION <br />TIME K K <br />INTERVAL (cm/sec)(ft/yr) <br />2:00:00 9.59E-08 0.10 <br />3:10:00 1.21E-07 0.13 <br />14:00:00 8.31E-08 0.09 <br />5:00:00 7.93E-08 0.08 <br />Dry Density 115.9 at 13.6% Moisture <br />PROJECT: <br />LOCATION: <br />MATERIAL: <br />SAMPLE SOURCE: <br />DENSITY TEST: <br />74201125N0.****.**** <br />1SLF-50-R <br />10/26/2015 <br />CC&V SGVLF <br />Phase 1 <br />Brown clayey sand with gravel <br />Soil Liner Fill <br />Bottled Water <br />9.48E-08 <br />JOB NO: <br />WORK ORDER NO: <br />LAB NO: <br />DATE SAMPLED: <br />REVIEWED BY: <br />to <br />and <br />BR <br />2.670 <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.