Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch Valley Leach Facility   <br />Phase 1 Completion  <br />Construction Photographs  <br />  <br />  <br />Page 18  <br />  <br />Photo 35 – Backfilling Anchor Trench (September 12, 2016)   <br />  <br />Photo 36 – 100 mil LLDPE Geomembrane Deployment at South Perimeter Berm (September 14, 2016)