Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch Valley Leach Facility   <br />Phase 1 Completion  <br />Construction Photographs  <br />  <br />  <br />Page 12  <br />  <br />Photo 23 – Geomembrane Destructive Testing (July 14, 2016)  <br />  <br />Photo 24 – Soil Liner Fill Moisture Conditioning and Placement (July 15, 2016)