CRIPPLE CREEK &VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Drain Cover Fill: <br />None. <br />Rip Rap: <br />None. <br />Underground Workings: <br />Confirmatory Drilling: <br />UG #6617: Sandvik 700 –10.0 hours,1200LF. Further remediation required. <br />UG #6477: Sandvik 700 –26.0 hours,2250LF. Further remediation required. <br />UG #6478: Sandvik 700 –1.0 hour,250LF. Further remediation required. <br />Remediation: <br />UG# 6673: Completed placement of second and third geogrid layers. Completed <br />placement of second and third 6-inch lifts of Select Structural Fill. Structural backfill was <br />placed to bring slope to design grade. Remediated. <br />UG# 6692: Located possible stope during cut. A Cat excavator excavated 15+/-feet <br />encountering mining activity. Further remediation required after remainder of cut is <br />removed. T&M = 1.5 hours. <br />UG# 6531: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br />Further remediation required. <br />UG# 6538: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br />Further remediation required. <br />UG# 6455: A Cat excavator removed shot rock in preparation for geogrid subgrade. <br />Further remediation required. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />Cat haul trucks, a Cat excavator and a Cat skidsteer removed snow and placed SLF between <br />stations HM20+00 to HM17+00 in preparation for leak detection construction. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />Perimeter signage installed to delineate Phase 1 geomembrane extents installed to date. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.