My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:56:27 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont M <br />Cripple Cree <br />Squaw Gulc <br />NewFields J <br />Week Endin <br /> <br /> C <br /> M <br />in <br />st <br /> M <br />ex <br />to <br /> So1.3 <br />SLF proc <br />material <br />2.0 GEOS <br /> G2.1 <br />Four roll <br />the mate <br />been pre <br />3.0 STOR <br />Best Man <br />4.0 NEW <br />Two sam <br />plant. Th <br />analysis, <br />Mining Corporati <br />ek & Victor Gold <br />ch VLF CQA <br />ob No. 475.0106 <br />ng Saturday, Mar <br />o K16+00 <br />ompaction w <br />o M8+00 <br />o Below I <br />Material was <br />nto 740 arti <br />tockpile too <br />o I10+00 <br />o I16+00 <br />Material was <br />xcavator loa <br />o the sliver f <br />oil Liner Fill <br />cessing cont <br />has been pr <br />SYNTHETICS <br />Geogrid <br />s of geogrid <br />erial and to <br />eviously appr <br />RM WATER M <br />nagement Pr <br />WFIELDS LABO <br />mples of Soil <br />he samples <br />atterberg lim <br />ion <br /> Mine <br />6.006 <br />rch 05, 2016 <br />0 to K24+00 a <br />with smooth <br />to M12+00 <br />I30+00 to I36 <br />s cut from th <br />culating hau <br />k place in ar <br />to I14+00 an <br />to I20+00 an <br />s cut from th <br />aded the ma <br />fill that was b <br />(SLF) <br />tinued throu <br />rocessed as o <br /> <br />d were deliv <br />ok inventory <br />roved for us <br />MANAGEME <br />ractices cont <br />ORATORY A <br />Liner Fill (N <br />will be sen <br />mits, compa <br />and S20+00 <br />h drum roller <br />and S16+00 <br />6+00 <br />he hillside u <br />ul trucks, w <br />reas bounde <br />nd K6+00 to <br />nd K10+00 t <br />he hillside a <br />terial into 7 <br />being placed <br />ughout the <br />of Saturday, <br />vered to the <br />y of the de <br />e prior to de <br />ENT <br />tinued to be <br />CTIVITIES <br />NF‐SLF‐1‐C a <br />t to the Ne <br />action and pe <br />0 to S26+00 <br />rs in areas b <br />0 to S24+00 <br />using a D6 d <br />ho hauled t <br />d by the foll <br /> K10+00 <br />o K14+00 <br />t stations M <br />40 articulati <br />d below stat <br />week at D <br /> March 5, 20 <br />e site. NewF <br />livery. The r <br />elivery. <br />e performed <br />nd NF‐SLF‐2 <br />ewFields soi <br />ermeability t <br />bounded by b <br />dozer. An ex <br />the material <br />owing benc <br />M38+00 to M <br />ing haul truc <br />tions N12+00 <br />Dump 1. Ap <br />016. No SLF <br />Fields person <br />rolls were d <br />. <br />2‐C) were co <br />ls laborator <br />testing. <br />bench statio <br />xcavator loa <br />l to a local <br />h stations: <br />M42+00 with <br />cks, who hau <br />0 to N16+00 <br />proximately <br />was placed <br />nnel observe <br />delivered fro <br />ollected from <br />ry in Elko, N <br />P <br />ons: <br />ded the ma <br />stockpile. C <br />h a D6 doze <br />uled the ma <br />0. <br />y 45,000 ton <br />in the VLF. <br />ed off‐loadi <br />om lots that <br />m the proce <br />Nevada for <br />Page 3 <br />terial <br />Cut to <br />er. An <br />terial <br />ns of <br />ng of <br />t had <br />essing <br />sieve
The URL can be used to link to this page
Your browser does not support the video tag.