Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Underground Workings: <br />Blasting: <br />UG #6692:Previously drilled boreholes were shot. A Cat excavator removed shot rock. <br />Further remediation required. <br />Confirmatory Drilling: <br />None. <br />Remediation: <br />UG #6477: A Cat excavator removed shot rock. Further remediation required. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />A Cat excavator prepared leak detection trench in the vicinity of station I30+00.A Cat skidsteer <br />assisted with construction of approximately 200 LF of leak detection per project plans and <br />specifications. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.