Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Confirmatory Drilling: <br />UG #6520: Sandvik 700 –13.5 hours,1000LF.Further remediation required. <br />UG #6692: Sandvik 800 –8.0 hours,400LF.Further remediation required. <br />Remediation: <br />UG #6694:Began investigating unknown working.Adits found extending North/South. <br />Further remediation required.T&M =Cat excavator,5.5 hours. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />A Cat excavator prepared leak detection trench between stations I28+00 to I30+00.A Cat <br />skidsteer assisted with construction of approximately 250 LF of leak detection per project plans <br />and specifications. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.