My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:56:27 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Underground Workings: <br />Blasting: <br />UG #6477: Confirmatory boreholes were shot. Further remediation required. <br />Confirmatory Drilling: <br />UG #6617: Sandvik 700 –7.0 hours,800LF. Further remediation required. <br />UG #6691: Sandvik 700 –9.0 hours,1250LF.Sandvik 800 –7.0 hours,750LF.Further <br />remediation required.UG #6691: Sandvik 800 –8.5 hours,900LF.Further remediation <br />required. <br />UG #6692: Sandvik 700 –18.0 hours,2250LF.Further remediation required. <br />UG #6520: Sandvik 800 –7.0 hours,300LF.Further remediation required. <br />Remediation: <br />UG #6455/6456: A Cat dozer and a Cat smooth drum roller placed and compacted <br />structural backfill to geogrid subgrade. Completed placement of the first and second <br />layer of geogrid. Completed placement and compaction of Select Structural Fill. <br />Remediated. <br />UG #6454: Completed structural backfill and compaction to subgrade elevation. <br />Remediated. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />A Cat excavator prepared leak detection trench between stations I0+00 and I2+00 and I16+00 to <br />I28+00. A Cat skidsteer assisted with construction of approximately 1150 LF of leak detection <br />per project plans and specifications. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.
The URL can be used to link to this page
Your browser does not support the video tag.