Laserfiche WebLink
Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionStaff Schedule for Amec PersonnelDecember 201512/1 12/2 12/3 12/4 12/5 12/6 12/7 12/8 12/9 12/10 12/11 12/12 12/13 12/14 12/15 12/16 12/17 12/18 12/19 12/20 12/21 12/22 12/23 12/24 12/25 12/26 12/2712/28 12/29 12/30 12/31Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W ThBobby ReddPRPRPRPRPR‐PRPRPRPRPR‐‐PRPRPR‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Ben MellySTGTGTGTGT‐LGLGLGLGLG‐‐ST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Tyler BrowningSTGTGTGTST‐STGTGTGTGT‐‐ST‐LTLTLT‐‐‐‐‐‐‐‐‐‐‐‐‐Rick Buxton‐‐‐‐‐‐‐‐‐‐‐‐LTLTLTLTLTLTLT‐‐‐‐‐‐‐‐‐‐‐‐Shawn WiselySTSTSTSTUG‐STSTSTSTUG‐‐UG‐UG‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Madeline TarasarSTSTSTSTST‐STSTSTSTST‐‐ST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐David WoolleySTSTSTSTST‐GTSTGTGTST‐‐GT‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Rod BernuthSTSTSTSTST‐STSTSTSTST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Steve RiceUGUGUGUG‐‐UGUGUGUGUG‐‐UG‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Philemon Onyango‐‐‐‐GT‐GT‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Tony Dean‐‐‐‐ST‐STST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Dan South‐‐‐‐‐‐‐‐STSTST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Joe Compton‐‐‐‐‐‐‐‐STST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Paul Malloy‐‐‐‐‐‐‐‐‐STST‐‐ST‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Andrea Meduna PE ‐ ‐ PE‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Acronyms:PE Principal Engineer LS Lead Soils Technician LG Lead Geosynthetics TechnicianPCE Project Certifying Engineer ST Soils Technician GT Geosynthetics TechnicianPR  Project Resident LT Laboratory Technician UG Underground Working RemediationNotes:1. Amec Foster Wheeler Personnel based on information from weekly reporting.2.PersonnelDateSchedule previous to December 1, 2015 is reported in the Amec Foster Wheeler "Squaw Gulch VLF Phase 1 (9,550‐foot Elevation Bench to Completed Areas Outlined on Figure 2) Final Report" issued January 2016.Page 1 of 3