Laserfiche WebLink
Table 11Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionNuclear Gauge Moisture‐Density Testing Summary ‐ Soil Liner FillNORTHING EASTINGSAMPLE NUMBERMAX. DRY DENSITY (pcf)OPTIMUM MOISTURE (%)DRY DENSITY (pcf)MOISTURE CONTENT (%)SPECIFIED COMPACTION (%)COMPACTION (%)TEST NUMBER DATE TESTEDDEPTH (in)LABORATORYPASS/FAILFIELDLOCATIONNFSLF‐180‐N 09/08/16 54,773.5 36,410.5 12 NFSLF‐49‐R 121.4 11.8 118.6 13.1 95 97.7% PASSNFSLF‐181‐N 09/08/16 54,885.8 36,382.7 10 NFSLF‐49‐R 121.4 11.8 120.1 13.4 95 98.9% PASSNFSLF‐182‐N 09/08/16 55,048.1 36,402.0 12 NFSLF‐49‐R 121.4 11.8 119.6 13.0 95 98.5% PASSNFSLF‐183‐N 09/10/16 55,712.5 36,946.8 12 NFSLF‐49‐R 121.4 11.8 118.6 12.5 95 97.7% PASSNFSLF‐184‐N 09/10/16 55,488.7 36,662.1 12 NFSLF‐42‐R 126.4 10.1 124.1 11.2 95 98.2% PASSNFSLF‐185‐N 09/10/16 55,116.7 36,507.8 12 NFSLF‐42‐R 126.4 10.1 126.1 11.9 95 99.8% PASSNFSLF‐186‐N 09/10/16 54,769.6 36,448.3 12 NFSLF‐49‐R 121.4 11.8 116.4 13.0 95 95.9% PASSNFSLF‐187‐N 09/10/16 54,708.5 36,430.8 12 NFSLF‐49‐R 121.4 11.8 118.6 12.8 95 97.7% PASSNFSLF‐188‐N 09/10/16 54,684.9 36,530.9 12 NFSLF‐49‐R 121.4 11.8 120.9 13.2 95 99.6% PASSNotes:1. Only testing performed within the limits of the Phase 1 Completion area are presented in this table. For a complete list of testing performed by Amec, refer to the reports "Squaw Gulch VLF Phase 1 (9,450' to 9,550' Bench) and "Squaw Gulch VLF Phase 1 (9,550‐foot Bench to Completed Areas Outlined on Figure 2)" submitted by Amec in October 2015 and January 2016, respectively.Page 11 of 11