|
Table 11Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionNuclear Gauge Moisture‐Density Testing Summary ‐ Soil Liner FillNORTHING EASTINGSAMPLE NUMBERMAX. DRY DENSITY (pcf)OPTIMUM MOISTURE (%)DRY DENSITY (pcf)MOISTURE CONTENT (%)SPECIFIED COMPACTION (%)COMPACTION (%)TEST NUMBER DATE TESTEDDEPTH (in)LABORATORYPASS/FAILFIELDLOCATION1N490 11/01/15 56,578.8 35,460.4 10 1SLF‐51‐R 114.7 14.3 112.4 14.5 95 97.99 Pass1N491 11/01/15 56,583.5 35,363.3 10 1SLF‐51‐R 114.7 14.3 111.9 13.6 95 97.56 Pass1N492 11/01/15 56,666.6 35,290.6 10 1SLF‐51‐R 114.7 14.3 115.7 14.3 95 100+ Pass1N493 11/02/15 56,655.3 35,376.6 10 1SLF‐52‐R 115.2 14.6 110.7 13.8 95 96.09 Pass1N494 11/02/15 56,608.2 35,520.7 10 1SLF‐52‐R 115.2 14.6 119.7 14.6 95 100+ Pass1N495 11/02/15 56,542.9 35,541.6 10 1SLF‐52‐R 115.2 14.6 112.0 14.4 95 97.22 Pass1N496 11/02/15 56,449.9 35,549.7 10 1SLF‐52‐R 115.2 14.6 116.9 13.2 95 100+ Pass1N497 11/02/15 56,512.0 35,654.4 10 1SLF‐53‐R 112.3 15.4 108.7 14.9 95 96.79 Pass1N498 11/04/15 56,460.6 35,741.2 10 1SLF‐53‐R 112.3 15.4 116.7 15.3 95 100+ Pass1N499 11/04/15 56,386.3 35,634.8 10 1SLF‐53‐R 112.3 15.4 108.4 15.2 95 96.53 Pass1N500 12/01/15 56,472.3 35,785.0 10 1SLF‐53‐R 112.3 15.4 111.2 13.4 95 99.02 Pass1N500A 12/02/15 10 1SLF‐53‐R 112.3 15.4 110.6 13.6 95 98.49 Pass1N501 12/02/15 56,430.7 35,806.6 10 1SLF‐53‐R 112.3 15.4 111.5 13.5 95 99.29 Pass1N502 12/03/15 56,353.7 35,856.6 10 1SLF‐53‐R 112.3 15.4 111.0 13.5 95 98.84 Pass1N503 12/03/15 56,271.3 35,931.7 10 1SLF‐53‐R 112.3 15.4 110.2 13.8 95 98.13 Pass1N504 12/03/15 56,426.9 35,999.7 10 1SLF‐54‐R 113.1 15.2 111.2 13.6 95 98.32 Pass1N506 12/04/15 56,313.1 36,855.7 10 1SLF‐54‐R 113.1 15.2 112.6 15.2 95 99.56 Pass1N507 12/04/15 56,295.5 36,905.0 10 1SLF59‐R 0.0 0.0 111.7 14.4 95 100+ Pass1N508 12/05/15 56,378.0 36,608.6 10 1SLF58‐R 115.9 14.2 114.1 14.1 95 100+Pass1N509 12/05/15 56,291.0 36,592.6 10 1SLF58‐R 115.9 14.2 112.3 14.6 95 100+Pass1N510 12/07/15 56,429.6 36,471.0 10 1SLF58‐R 115.9 14.2 103.2 12.1 95 100+Pass1N510A 12/09/15 10 1SLF58‐R 115.9 14.2 113.5 14.6 95 100+ Pass1N512 12/09/15 56,301.7 36,394.9 10 1SLF58‐R 115.9 14.2 113.6 14.6 95 98.02 Pass1N513 12/10/15 56,290.3 36,118.5 10 1SLF58‐R 115.9 14.2 115.2 14.2 95 99.40 Pass1N514 12/10/15 56,385.7 36,168.2 10 1SLF‐55‐R 115.6 12.4 110.3 13.4 95 95.42 Pass1N515 12/10/15 56,423.3 36,234.0 10 1SLF‐55‐R 115.6 12.4 109.8 11.9 95 94.98 FailRetestRetestPage 3 of 11
|