Laserfiche WebLink
Table 7Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Structural Fill24.0" 18.0" 12.0" 4.0" 3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #20 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐0‐25‐ ‐ 30 MAX.SAMPLE NUMBERDATE SAMPLEDNATURAL MOISTURE (%)LOCATIONSPECIFICATIONATTERBERG LIMITSSPECIFICATION ‐ PERCENT PASSINGUSCS GRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGELEVATION (FT)SF‐82‐R 05/08/14 1 ‐ 7.2 100 100 69 34 34 32 31 31 30 30 30 23 17 12 9 8 6 5.1 SM NP NV NPSF‐83‐R 05/08/14 1 ‐ 6.7 100 100 73 33 33 32 31 29 29 28 28 22 16 11 8 7 6 4.6 SM NP NV NPSF‐84‐R 06/19/14 1 9,860.0 5.4 100 100 80 51 51 44 38 33 31 29 27 24 19 14 11 9 7 5.3GP‐GM NP NV NPSF‐85‐R 06/23/14 2 58,839.5 34,733.5 9,943.4 9.3 100 90 51 16 16 15 13 11 10 7 43221110.8GP‐GM NP NV NPSF‐86‐R 06/24/14 1 56,353.2 37,557.1 9,882.6 7.0 100 100 96 61 60 60 58 57 56 555547372821191411 SM NP NV NPSF‐87‐R 06/25/14 1 ‐ 11.2 100 89 66 40 40 39 38 38 37 37 37 32 26 21 18 17 14 12 SC 20 288SF‐88‐R 07/01/14 1 ‐ 7.0 100 85 57 27 26 26 26 25 25 24 24 17 1064432.1SP‐SM NP NV NPSF‐89‐R 07/01/14 1 9,648.4 9.1 100 100 94 76 76 75 74 72 70 67 64 50 35 25 19 17 13 11SM NP NV NPSF‐90‐R 07/11/14 1 56,742.4 35,647.1 9,811.6 6.1 100 100 80 16 16 14 13 10 7 4 10.5 0.3 0.2 0.1 0.1 0.1 0.1 GP NP NV NPSF‐91‐R 07/11/14 2 56,738.5 35,847.1 9,824.2 7.1 100 100 27 109987530.60.50.40.30.30.20.20.2GP NP NV NPSF‐92‐R 07/11/14 2 56,762.1 36,247.0 9,847.3 7.1 100 100 90 12 12 10865433211110.5GW NP NV NPSF‐93‐R 08/21/14 1 56,305.1 36,408.7 9,674.5 5.3 100 100 100 100 100 99 98 9796 95 94 70 53 40 31 28 21 16 SM NP NV NPSF‐94‐R 08/21/14 1 56,206.0 37,486.6 9,897.9 10.3 100 100 100 100 99 99 99 9898 98 98 80 61 46 37 34 28 24 SC 20 28 8SF‐95‐R 09/24/14 1 56,462.8 35,313.4 9,611.4 10.8 100 93 80 29 28 26 23 18 13 70.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 GP NP NV NPSF‐96‐R 09/24/14 1 56,116.7 35,048.6 9,450.1 7.2 100 77 45 23 23 22 19 15 11 6 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.1 GP NP NV NPSF‐97‐R 10/08/14 2 57,046.9 36,565.1 9,966.3 13.9 100 91 81 27 13 12 10 8 6 3 0.5 0.4 0.3 0.3 0.2 0.2 0.2 0.1 GW NP NV NPSF‐98‐R 10/16/14 2 56,962.4 37,236.8 9,988.4 9.3 100 100 66 11 11 11 10974210.90.60.40.40.30.2GP NP NV NPSF‐99‐R 10/25/14 2 57,015.9 36,898.2 9,998.1 4.4 100 100 100 90 47 47 45 42 38292412865542.6GP‐GM NP NV NPSF‐100‐R 10/25/14 2 56,731.9 36,660.1 9,883.8 2.3 100 100 97 41 41 40 39 37 3634 31 23 15 10 7 6 5 3.5 SP‐SM NP NV NPSF‐101‐R 10/25/14 1 56,411.1 37,561.6 9,924.1 8.3 100 100 79 50 50 49 48 45 4238 33 29 22 17 14 13 11 9.3 GM NP NV NPSF‐102‐R 10/29/14 1 56,157.2 37,519.2 9,924.3 8.1 100 83 74 38 21 19 17 13 10 50.8 0.7 0.5 0.4 0.3 0.3 0.2 0.2 GW NP NV NPSF‐103‐R 10/29/14 2 57,038.9 36,791.5 10,003.3 5.9 100 100 100 59 21 20 19 1511 6 0.9 0.6 0.5 0.4 0.3 0.3 0.2 0.2 GP NP NV NPSF‐104‐R 10/29/14 2 56,816.8 37,458.6 9,994.7 6.7 100 100 89 63 18 17 15 12 9 51 0.8 0.6 0.5 0.4 0.3 0.3 0.2 GP NP NV NPSF‐105‐R 11/17/14 2 56,664.4 37,870.6 10,011.2 3.9 100 86 70 54 19 18 16 14 11742210.90.90.70.5GW NP NV NPSF‐106‐R 11/17/14 2 56,447.8 37,951.0 10,012.0 1.5 100 100 85 52 18 17 16 13 1184210.90.70.70.60.4GP NP NV NPSF‐107‐R 11/18/14 2 55,396.2 37,287.2 9,919.8 9.0 100 100 100 78 18 18 17 15 1310654322221.5GP‐GM NP NV NPSF‐108‐R 11/18/14 1 56,566.3 37,337.7 9,921.3 9.5 100 75 75 58 21 20 19 17 14 1066543332.2GP‐GM NP NV NPSF‐109‐R 11/19/14 2 57,151.8 36,484.0 10,017.8 6.8 100 100 100 74 33 31 28 24191497654321.9GW‐GM NP NV NPSF‐110‐R 11/19/14 2 57,073.8 36,844.0 10,012.4 7.7 100 100 84 55 23 22 20 17 141065432221.4GP‐GM NP NV NPSF‐111‐R 11/19/14 2 58,939.1 34,770.5 9,964.6 7.4 100 100 100 80 48 44 39 33 27201211975542.9GW‐GM NP NV NPSF‐112‐R 12/16/14 2 57,079.2 36,811.4 10,017.4 4.8 100 100 100 87 35 34 31 27221596432221.2GW NP NV NPSF‐113‐R 01/08/15 2 57,300.0 36,472.1 10,057.7 7.0 100 100 86 17 16 15 14 12 9743221110.8GP‐GM NP NV NPSF‐114‐R 01/26/15 1 55,708.8 37,321.4 9,998.3 5.3 100 100 100 69 31 30 28 25 2116108543221.3GW NP NV NPSF‐115‐R 01/27/15 1 55,759.8 37,419.9 10,003.9 4.2 100 100 91 71 27 25 22 19 151053221110.8GP NP NV NPSF‐116‐R 01/27/15 1 55,895.0 37,469.8 10,001.5 5.1 100 100 100 80 29 27 24 20161164322110.8GP NP NV NPSF‐117‐R 01/27/15 1 56,059.0 37,541.1 9,989.3 5.1 100 100 100 85 27 25 22 18 141054321110.7GP NP NV NPSF‐118‐R 01/27/15 2 57,439.1 36,597.8 10,106.9 6.4 100 64 61 26 26 25 22 18 137 1 1 0.4 0.3 0.2 0.2 0.2 0.1 GP NP NV NPSF‐119‐R 01/27/15 2 57,491.9 36,476.3 10,107.7 5.6 100 63 39 1097666553322110.8GW‐GM NP NV NPSF‐120‐R 02/10/15 1 55,862.4 37,480.9 10,011.3 2.1 100 81 67 59 58 54 47 39 3122129754432.2GP NP NV NPBetween Bench D STA D1+00 & Bench F STA F18+00ADR Haul Road STA 72+00ADR Haul Road STA 70+00Bench J STA J12+50Bench D STA D0+00Phase 1 between Bench D STA D1+00 & Bench F STA F18+00NP ‐ Non PlasticNV ‐ No ValuePage 3 of 4Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.