Laserfiche WebLink
Table 3 <br />Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Completion <br />Summary of Weather Data <br />Date <br />Low Ambient  <br />Temperature  <br />(°F) <br />High  <br />Ambient  <br />Temperature  <br />(°F) <br />Precipitation  <br />(inches) <br />Maximum  <br />Wind Speed  <br />(mph) <br />Remarks <br />Wednesday, September 21, 2016 43 62 0.01 24 <br />Thursday, September 22, 2016 45 66 0 24 <br />Friday, September 23, 2016 28 61 0 39 <br />Temperature remained  <br />above 32° during shift <br />Saturday, September 24, 2016 26 48 0 25 No work performed <br />Sunday, September 25, 2016 31 54 0 16 No work performed <br />Monday, September 26, 2016 33 62 0 17 <br />Tuesday, September 27, 2016 37 67 0 18 <br />Wednesday, September 28, 2016 43 62 0 19 <br />Thursday, September 29, 2016 40 63 0 20 <br />Friday, September 30, 2016 38 59 0.73 16 <br />Saturday, October 01, 2016 38 60 0.01 17 <br />Sunday, October 02, 2016 41 58 0 19 No work performed <br />Monday, October 03, 2016 32 55 0 40 <br />Tuesday, October 04, 2016 23 46 0 23 <br />Wednesday, October 05, 2016 27 47 0 24 <br />Thursday, October 06, 2016 25 43 1.5 27 Work paused at 8:30 am <br />Friday, October 07, 2016 24 49 0 17 <br />Saturday, October 08, 2016 35 58 0 19 No work performed <br />Sunday, October 09, 2016 34 58 0 14 No work performed <br />Notes: <br />1. The QA Monitor transitioned from Amec to NewFields on March 1, 2016. <br />Page 9 of 9