My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (36)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:53:57 AM
Creation date
12/22/2016 8:15:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - 2 ROC Drawings
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING COMPANY SQUAW GULCH VALLEY LEACH FACILITY PHASE 1CRIPPLE CREEK & VICTOR GOLD MINING COMPANY GENERAL COMPOSITE OVERVIEWORE STORAGE AREA (PHASE 1 COMPLETION)SQUAW GULCH VALLEY MILL FACILITYFEBRUARY 2013SQUAW GULCH VALLEY LEACH FACILITYORE STORAGE AREA 2015TOP OF SOIL LINER FILLDRAWING 2 OF 8 DATED SEPTEMBER 21, 2015SQUAW GULCH VALLEY LEACH FACILITYORE STORAGE AREA 2016TOP OF SOIL LINER FILLDRAWING 2 OF 6 DATED JANUARY 5, 2016SQUAW GULCH VALLEY LEACH FACILITYPREGNANT SOLUTION STORAGE AREA 2014TOP OF SOIL LINER FILLDRAWING 2 OF 9 DATED OCTOBER 6, 20140'100'200'300' LEGEND MAJOR CONTOUR TOP SLFMINOR CONTOUR TOP SLF SGVLF PHASE 1 GEOMEMBRANE LIMITS 2015(9,450' BENCH TO 9,550' BENCH)SGVLF PSSA GEOMEMBRANE LIMITS 2014SGVLF PHASE 1 GEOMEMBRANE LIMITS 2016(9,550' BENCH TO COMPLETED AREAS OUTLINED ON FIGURE 2)SGVLF PHASE 1 COMPLETION GEOMEMBRANE LIMITS 2016SGVLF MILL FACILITY GEOMEMBRANE LIMITS 2013the maps herein accurately represents said surveys, to the best of my knowledge.commenced more than ten years from the date of the certification shown hereon.defect. In no event, may any action based upon any defect in this survey beupon any defect in this survey within three years after you first discover suchNOTICE: According to Colorado law you must commence any legal action basedOctober 2016, as-built surveys were conducted under my supervision andCripple Creek & Victor Gold Mining Company that from November 2014, throughColorado, do hereby certify only to Ames Construction Company, Inc. andI, Paul B. Gallagher, a Registered Professional Land Surveyor in the State ofSURVEYOR'S CERTIFICATE:Paul B. Gallagher, P.L.S. No. 16403Ames Construction Inc.For and on Behalf ofE 34,000E 34,000E 34,500E 34,500E 35,000E 35,000E 35,500E 35,500E 36,000E 36,000E 36,500E 36,500E 37,000E 37,000E 37,500E 37,500E 38,000E 38,000N 55,000N 55,000N 55,500N 55,500N 56,000N 56,000N 56,500N 56,500N 57,000N 57,000N 57,500N 57,500
The URL can be used to link to this page
Your browser does not support the video tag.