Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING COMPANY SQUAW GULCH VALLEY LEACH FACILITY PHASE 1CRIPPLE CREEK & VICTOR GOLD MINING COMPANY GENERAL COMPOSITE OVERVIEWORE STORAGE AREA (PHASE 1 COMPLETION)SQUAW GULCH VALLEY MILL FACILITYFEBRUARY 2013SQUAW GULCH VALLEY LEACH FACILITYORE STORAGE AREA 2015TOP OF SOIL LINER FILLDRAWING 2 OF 8 DATED SEPTEMBER 21, 2015SQUAW GULCH VALLEY LEACH FACILITYORE STORAGE AREA 2016TOP OF SOIL LINER FILLDRAWING 2 OF 6 DATED JANUARY 5, 2016SQUAW GULCH VALLEY LEACH FACILITYPREGNANT SOLUTION STORAGE AREA 2014TOP OF SOIL LINER FILLDRAWING 2 OF 9 DATED OCTOBER 6, 20140'100'200'300' LEGEND MAJOR CONTOUR TOP SLFMINOR CONTOUR TOP SLF SGVLF PHASE 1 GEOMEMBRANE LIMITS 2015(9,450' BENCH TO 9,550' BENCH)SGVLF PSSA GEOMEMBRANE LIMITS 2014SGVLF PHASE 1 GEOMEMBRANE LIMITS 2016(9,550' BENCH TO COMPLETED AREAS OUTLINED ON FIGURE 2)SGVLF PHASE 1 COMPLETION GEOMEMBRANE LIMITS 2016SGVLF MILL FACILITY GEOMEMBRANE LIMITS 2013the maps herein accurately represents said surveys, to the best of my knowledge.commenced more than ten years from the date of the certification shown hereon.defect. In no event, may any action based upon any defect in this survey beupon any defect in this survey within three years after you first discover suchNOTICE: According to Colorado law you must commence any legal action basedOctober 2016, as-built surveys were conducted under my supervision andCripple Creek & Victor Gold Mining Company that from November 2014, throughColorado, do hereby certify only to Ames Construction Company, Inc. andI, Paul B. Gallagher, a Registered Professional Land Surveyor in the State ofSURVEYOR'S CERTIFICATE:Paul B. Gallagher, P.L.S. No. 16403Ames Construction Inc.For and on Behalf ofE 34,000E 34,000E 34,500E 34,500E 35,000E 35,000E 35,500E 35,500E 36,000E 36,000E 36,500E 36,500E 37,000E 37,000E 37,500E 37,500E 38,000E 38,000N 55,000N 55,000N 55,500N 55,500N 56,000N 56,000N 56,500N 56,500N 57,000N 57,000N 57,500N 57,500