Laserfiche WebLink
� o <br />MITS GRO D SURVEY PRO IDED <br />r 1 W <br />�: .`�,�'� ". •�, - Y. FOREST% T WEST SURVEYING. <br />o r <br />WE <br />Q► Ij�j��,����� � SII 1� ' ,� � � a� , � <br />v Awl <br />QQ <br />11Its <br />26 <br />Nat �p�=lam ���` � � �,:•'�� � II <br />ONWl WE <br />„r <br />FBI <br />Sw <br />�����/ �/� .%/// viii --- � ► ����/ • ' �� � �//ll/ ^ n�� <br />r I////�� �� 111► <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET (LAND SURVEY) <br />MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />REGRADED GROUND SURFACE CONTOUR AND EL, FEET <br />EXISTING ROADS <br />SQUAW GULCH VLF PHASE 1 LIMIT <br />EXISTING RAILROAD <br />SOLUTION COLLECTION PIPING: <br />4" DIA. PCPE HIGHWAY GRADE TERTIARY SOLUTION COLLECTION PIPE PLACED ON 95' CENTERS <br />-- 8" DIA. PCPE (ADS N-12 OR EQUIVALENT) SOLUTION COLLECTION PIPE <br />----- 12" DIA. PCPE (ADS N-12 OR EQUIVALENT) SOLUTION COLLECTION PIPE <br />----- 15" DIA. PCPE (ADS N-12 OR EQUIVALENT) SOLUTION COLLECTION PIPE <br />------- 18" DIA. PCPE (ADS N-12 OR EQUIVALENT) SOLUTION COLLECTION PIPE <br />—- 24" DIA. PCPE (ADS N-12 OR EQUIVALENT) SOLUTION COLLECTION PIPE <br />—— 28" DIA. SDR 11 HDPE PRIMARY SOLUTION COLLECTION PIPE <br />NOTES: <br />1. SOLUTION COLLECTION PIPING SHALL BE PLACED WITH A <br />MINIMUM SLOPE OF 1 PERCENT, AND SHALL BE ADJUSTED <br />TO AVOID PLACEMENT PERPENDICULAR TO SLOPE. <br />2. REMOVED EXISTING UTILITIES FROM DRAWING. <br />3. UPDATED EXISTING GROUND TO INCLUDE MILL PLATFORM. <br />4. UNDERDRAIN POND AND PHASE 2 SEDIMENT POND HAVE <br />BEEN REVISED. <br />5. PHASE 2 SURFACE WATER DIVERSION CHANNEL AND <br />SEDIMENT DETENTION POND WILL BE BUILT WITH PHASE 1. <br />6. PSSA EMBANKMENT HAS BEEN WIDENED BY 2'. <br />300 0 300 600 FEET <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TOPO -PHASE 2. DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TOPO EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH67 TOPO 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VL1-2 TOPO EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028—COMOSITE—TOPO MILE UMITS.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />