Laserfiche WebLink
713 <br />i EXISTING GROUND SURFACE CONTOUR AND EL, FEET (LAND SURVEY) <br />i PROPOSED GROUND SURFACE CONTOUR AND EL. FEET <br />- DAYLIGHT LINE <br />-� CENTERLINE LINE <br />-- FLOWLINE LINE <br />2 <br />10000 <br />1000 <br />PVI S A:40 <br />76.54 <br />PVI LEV:9 <br />29.21 <br />21.5 <br />L C:100. <br />DO <br />9901 <br />9900 <br />m <br />-0 <br />� <br />M <br />� <br />� <br />HAUL <br />ROAD <br />FINISH D <br />N <br />9800 <br />9800 <br />m>m <br />m <br />>W <br />W <br />- <br />-- <br />- --- <br />- <br />EXITING <br />ROUN <br />po <br />•��� <br />9700 <br />9700 <br />�• <br />E. <br />9600 <br />m <br />M <br />9600 V 39 365 <br />M <br />M <br />I` <br />W <br />O <br />� <br />O <br />ui <br />'�N <br />mm <br />m m <br />m <br />mm <br />m <br />m <br />m <br />:0'; <br />m <br />38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 <br />100 0 100 200 FT 100 0 100 200 FT <br />CLIENT CRIPPLE CREEK & VICTOR <br />HORIZONTAL VERTICAL <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.' <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO - PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TORO - PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TOPS EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH67 TOPS 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOPO EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028-COMOSITE-TOPO MILE LIMITS.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />