My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (34)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (34)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:53:36 AM
Creation date
12/22/2016 8:15:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - 1 IFC Drawings
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET (LAND SURVEY) <br />MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />-� ISOPACH CUT CONTOURS AND EL, FEET <br />-- ---� ISOPACH ZERO CUT/FILL AND EL, FEET <br />-� ISOPACH FILL CONTOURS AND EL, FEET <br />- - - - - DAYLIGHT LINE <br />---- EXISTING UNIMPROVED ROAD/TRAILS <br />i--- EXISTING DRAINAGES <br />STATE HIGHWAY 67 <br />EXISTING BUILDING <br />NOTE: <br />1. REMOVED EXISTING UTILITIES FROM DRAWING. <br />2. UPDATED EXISTING GROUND TO INCLUDE MILL PLATFORM. <br />3. UNDERDRAIN POND, PHASE 1, AND PHASE 2 SEDIMENT <br />DETENTION POND HAVE BEEN REVISED. <br />4. PHASE 2 SURFACE WATER DIVERSION CHANNEL AND 1 <br />SEDIMENT DETENTION POND WILL BE BUILT WITH PHASE 1 <br />5. PSSA EMBANKMENT HAS BEEN WIDENED BY 2. <br />300 0 300 600 FEET <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO - PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />TORO PHASE <br />�!T <br />SQUAW GULCH BASE - 3.DWG <br />(RECV MAY 4, 2010) <br />��� <br />' L �S <br />CCV TORO EXPANSION 12-29-10 NORTH AREA.DWG <br />.: y <br />? <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH87 TOP Q 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />1 3 5 0.: <br />: <br />VLF2 TOP O EXPANSION 8-05-11 DWG <br />(RECV AUGUST 9, 2011) <br />I 13 <br />09028-COMOSITE-TOPO MILE LIMITS.DWG <br />Cy f{ <br />{ <br />(RECV MAY 28, 2010 FROM CC&V) <br />..... �� <br />Di_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.