Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 8  <br />geomembrane wear sheet was placed below the PVC grade marker to protect the approved  <br />geomembrane from damage. The PVC grade markers were removed after DCF thickness  <br />verification.  <br />A CQA Monitor was present during all DCF placement activities to verify that the DCF was  <br />placed  in  accordance  with  the  project  technical  specifications and  that  no  damage  to  the  <br />geomembrane occurred. If any damage to the geomembrane was noted, work activities were  <br />paused and the damage was repaired prior to resuming DCF placement.  <br />3. QUALITY ASSURANCE/QUALITY CONTROL  <br />QA/QC activities were performed by the CQA Monitor for all shifts during the Squaw Gulch VLF  <br />project.  An  office  and  field  laboratory  was  used  to  organize  data  and  perform  necessary  <br />laboratory  testing  onsite.  QA/QC  activities  performed  included;  monitoring  all  aspects  of  <br />construction, inspection and approval of all project components, laboratory testing of soils and  <br />geomembrane, field testing of soils and geomembrane, documentation of construction and  <br />QA/QC activities.  <br />Daily and weekly construction progress reports were generated and submitted to CC&V and the  <br />Engineer of Record (EOR). The weekly construction progress reports were submitted to the  <br />Colorado Division of Reclamation, Mining and Safety (DRMS) each week and are presented in  <br />Appendix F. Photographs of construction activities were taken by the CQA Monitor throughout  <br />the  Squaw  Gulch  VLF  Phase  1  Completion.  Photographs  of  key  construction  elements  are  <br />presented in Appendix G. All testing and inspections were performed in accordance with the  <br />Technical Specifications presented in Appendix C.   <br />3.1. Testing Standards  <br />The CQA Monitor completed the earthwork laboratory testing in an on‐site soils laboratory to  <br />verify that all earthwork construction materials met the project  technical  specifications.  <br />Geomembrane and geotextile samples were sent to a third party laboratory to verify that the  <br />material  properties  met  the  project  technical  specifications.  All  testing  was  performed  in  <br />accordance with these American Society of Testing and Materials (ASTM) standards.  <br />3.1.1. Earthworks Testing Standards  <br /> Particle size analysis (ASTM C 117, C 136, D1140, D6913)  <br /> Atterberg limits (ASTM D 4318)  <br /> Laboratory moisture/density relationship (ASTM D 698)  <br /> Moisture Content (ASTM D2216)