Laserfiche WebLink
  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />  <br />   <br />SQUAW GULCH VALLEY LEACH FACILITY   <br />PHASE 1 COMPLETION  <br />RECORD OF CONSTRUCTION REPORT  <br />  <br />Prepared for:  <br />Cripple Creek & Victor Gold Mining Company  <br />P.O. Box 191  <br />Victor, CO 80860  <br />  <br />Prepared by:  <br />NewFields Mining Design & Technical Services  <br />9400 Station Street, Suite 300  <br />Lone Tree, Colorado 80124  <br />  <br />  <br />NewFields Job No. 475.0106.006  <br />October 14, 2016