Continued... <br />Page 2 of 2 <br />Amec Foster Wheeler did observe the structural fill placement to identify frozen chunks of <br />material so that the contractor could remove these prior to compaction. The weekly reports note <br />the fill material was above 32o F was to note that the material placed was loose and no frozen <br />material placed. <br />Drain cover fill (DCF) material placement observation also follows the same technique as <br />structural fill. Placement of the fill was visually observed to ensure no tears in the geomembrane <br />occurred during placement and no frozen material was placed. The last day of DCF placement <br />was 14 December 2015. DCF placement resumed sometime after Amec Foster Wheeler <br />departed from the project site on 29 February 2016. <br />Should you have any questions regarding this information, please contact me at (303)-630-0762 <br />or richard.weber@amecfw.com . <br /> <br />Sincerely, <br />Amec Foster Wheeler Environment & Infrastructure, Inc. <br /> <br /> <br /> <br /> <br />Richard Weber <br />Unit Manager <br /> <br /> <br /> Andrea L. Meduna, PE <br /> Project Manager <br /> <br /> <br /> <br />Attachment: Fill Temperature Monitoring Summary <br />