Laserfiche WebLink
ft <br /> ® <br /> p'jC 2o10% TRAPPER MINING INC. <br /> _e <br /> ..st10N CRAIG, COLORADO <br /> pIV1M N1NG p,W Sp���i <br /> HORSE GULCH FILL <br /> QUARTERLY FILL CERTIFICATION <br /> I, Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br /> accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br /> Horse Gulch Fill construction. This quarterly inspection was conducted on December 13, 2016. <br /> The fill was inspected for stability, and no appearance of instability, structural weakness, or <br /> other hazardous condition was observed during inspection. Construction during this quarter has <br /> been under my supervision, and to the best of my knowledge and belief, has been consistent <br /> with the design approved by the Colorado Division of Reclamation, Mining, and Safety. <br /> \\\\�xa�PDo"'��ai,//'Z <br /> CF '% <br /> _�;° 43864 �:Q_ <br /> Tonia Marie Perkins +QZZ <br /> ZZ <br /> CO PE 43864 <br /> III I 11100 <br /> � <br /> Date <br />