My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-16_INSPECTION - C1981028
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981028
>
2016-12-16_INSPECTION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 7:15:32 AM
Creation date
12/16/2016 10:31:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Date
12/16/2016
Doc Name
Inspection Report
From
DRMS
To
Coors Energy Company
Inspection Date
12/15/2016
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 15, 2016 C-1981-028/Keenesburg Strip Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 4 <br /> <br />Structures 4.05.7; Impoundments 4.05.9; Ground Water Monitoring4.05.13; Underground Mine <br />Entry 4.05.10; Surface and Ground Water Monitoring 4.05.13; Stream Buffer Zones 4.05.18: <br />o Sediment pond 2 and the dugout pond were holding a small amount of water. <br />Both the Dugout Pond and Sediment Pond #2 were overgrown with cattails and scheduled for <br />clean out during winter freeze, (maintenance item #1). <br /> <br />TOPSOIL - Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4), Storage and Protection 4.06.3, <br />Redistribution 4.06.4: <br />No Erosional features on the top sand piles were observed. Overall top sand piles appeared stable and <br />shaped to a stable grade. <br />o Overburden placement is progressing from south to north toward the B Pit. Moving overburden, <br />cutting and filling was not taking place at time of inspection. <br /> <br /> <br />o B Pit is in process of <br />being backfilled and is <br />scheduled to be filled <br />and final grade <br />achieved by the end of <br />the December 2016. <br /> <br /> <br />Photo 1: Pit B backfill <br />progress. <br /> <br /> <br /> <br /> <br /> <br /> <br />o Area to the east of B Pit <br />has achieved final <br />grade. <br /> <br /> <br /> <br /> <br /> <br />Photo 2: Area to the east <br />of B pit showing final <br />grade. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.