Laserfiche WebLink
A"'A6.. <br /> FLATIRON <br /> Flatiron Constructors, Inc. <br /> 385 Interlocken Crescent Blvd <br /> Suite 900 <br /> Broomfield,CO 80021 <br /> 720-494-8000 MAIN <br /> 303-776-0072 FAX <br /> December 14, 2016 www.flatironcorp.com <br /> Division of Reclamation, Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> SUBJECT: Permit No. M-2006-078 <br /> 111 Annual Fee Invoice and Annual Report <br /> Flatiron Constructors, Inc hereby submits its 2016 Annual Report for the Camenish <br /> Borrow, Pit Number M-2006-078. A Check in the amount of$504 is included herein for <br /> the 2016 annual fee. <br /> Stripping of overburden material and export of material from the Camenish Borrow Pit <br /> began at the beginning of May 2007 for the Colorado Department of Transportation, 1-25 <br /> Widening Project No. IM-0253-160. Currently, all mining work has been completed. <br /> Reclamation work at the pit is complete with perimeter sealing from the surrounding <br /> alluvium with compacted core with approval of compacted clay liner from the State <br /> Engineer's Office. <br /> Best Regards, <br /> Kevin P7owll <br /> Operations Engineer <br /> Central Division <br /> Flatiron Construction <br />