Laserfiche WebLink
12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Page 4 of 5 <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded wl <br />l'9 <br />wrtopsoil�J� <br />mulched w/ <br />approved mix: <br />1 <br />re laced: <br />/ <br />ved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />D <br />fertilized w, <br />0 <br />replacement <br />IV/q <br />rate (tons/ac): <br />D <br />a vd fertilizer, <br />depth (in): <br />Seed <br />Fertilizer <br />application <br />f�� AIC <br />IAlMulch <br />applicationR application <br />l!►q <br />method: <br />method: method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? S NO NIA <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? �S NO NIA <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized In accordance with Rule 3.1.9(1)? YES NO NIA <br />If "NO" please explain: <br />16. 1f mining has exposed groundwater, is the site in compliance with the approved mining pian and Office oft tate <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO NJA <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO IA <br />19. is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br />19. Is your basis for legal right to enter still valid? YES NO <br />20. Does your permit require you to Submit monitoring information annually? t� NO NIA <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: l <br />