Laserfiche WebLink
1-40 Calculations for Two Ponds on the South Side of Railroad Loop Fill Slope (Ponds <br />RR -1 and RR -2) <br />1-41 Sediment Control Calculations - Material Storage at East Intakes <br />1-42 Refuse Data and Analysis (Mike Weigand's memo) <br />1-42A Refuse Data and Slope Stability Analysis Refuse Area 5A <br />1-42B Refuse Data and Slope Stability Analysis — Revised 2004 <br />1-43 Air Emission Permits <br />1-44 SEDCAD Runs on Various Areas, Small Area Exemption <br />1-45 SEDCAD Runs for Runoff Volume and V -Ditch Calculations, Road Base Storage <br />Pad <br />1-46 Water Discharge Permit <br />1-47 Reclamation Cost Estimate <br />1-48 IBLA Decision 94-366 <br />1-49 Post -reclamation Refuse Area Sedimentology Calculations <br />1-50 Refuse Pile Temporary Ditch Specifications <br />1-51 BLM Conditions <br />1-52 Completion of Typical Degas Borehole <br />1-53 B -Vent Shaft #2 Road Culvert Sizing Calculations <br />1-54 RDH -3 Road Culvert Sizing Calculations <br />1-55 B -Seam Dewatering System (SH -3) <br />1-56 SDH -3 Pond System Hydrology and Sedimentology <br />1-57 B -Seam Dewatering System #2 (SH -4) <br />Technical Revision TR70 (09/2016) <br />