My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-15_REVISION - C1981041 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2016-12-15_REVISION - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:15:09 AM
Creation date
12/15/2016 9:04:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/15/2016
Doc Name
Review Letter
From
OSM
To
DRMS
Type & Sequence
SL9
Email Name
MPB
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior4�fSon e, s, <br />OFFICE OF SURFACE MINING A .� <br />Reclamation anti Enforcement <br />Western Region Office �9,ONgNpE <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202-3050 RECEIVED <br />DEC 0 9 2016 <br />Mike Boulay, Director DEC 15 2016 <br />Office of Mined Land Reclamation <br />Division of Reclamation, Mining and Safety DIVISION OF D SSAFETY <br />RECLAMATION <br />MINING AND <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RIC: Approval of SL -9 Phase II and III Bond Release, Roadside Mine, Permit No. C-1981-041 <br />Dear Mr. Boulay, <br />This letter acknowledges the Office of Surface Mining Reclamation and Enforcement (OSMRE), Denver <br />Field Division (DFD) receipt and review of the above Phase II and III Bond Release Proposed Decision <br />document prepared by the Division of Reclamation Mining and Safety (DBMS) dated November 23, <br />2016. The Proposed Decision documents the applicant's compliance with the approved Colorado <br />regulatory program at Rule 3.03.2. <br />DRMS's proposed decision approves 2.8 acres of Phase II, 10.3 acres of Phases II and III, and 0.5 acres <br />of Phase III bond release. This bond release applies to portions of the Roadside Mine northeast of <br />Palisade, Colorado. OSMRE participated in the bond release inspection held on October 6, 2016. The <br />Bureau of Land Management did not participate in the inspection. By letter dated December 6, 2016, the <br />BLM provided its concurrence with the SL -9 bond release (attached). OSMRE interprets the BLM's <br />concurrence to mean the Roadside Mine is in compliance with all BLM coal lease stipulations. <br />OSMRE agrees with DBMS that Snowcap Coal Company, Inc. has met or exceeded the requirements for <br />Phase 11 and/or III bond release on the specified 13.6 acres of land as described in DBMS Proposed <br />Decision document. The Division currently holds a performance bond in the amount of $805,952.60 for <br />the Roadside Mine. DBMS proposes to release $52,216.63 with this bond release action ($6,415.15 less <br />than the amount Snowcap Coal Company requested). OSMRE agrees with tine findings and decision <br />document and hereby provides OSMRE concurrence for the above bond release action in accordance with <br />30 CFR 740.15 (d) (3), and 30 CFR 906.30, Article IX, Section 24, of the State -Federal Cooperative <br />Agreement. <br />Thank you and your staff for coordinating this Federal mine bond release action through the DPD. Please <br />direct any questions concerning this action to Christine Belka, Senior Regulatory Program Specialist at <br />chclkaL;()SMRI Tpy or (303) 293-5020. <br />Sincerely, <br />r=k�ki'%7i <br />Alan Boeluus, Chief <br />Denver Field Branch <br />Cc: Tonya Hammond, Snowcap Coal Company Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.