Laserfiche WebLink
• Map 2.05.3-5 Soil Sample and Soil Distribution Plan coincidentally <br />shows some culvert locations. Map 2.05.3-7 Culverts and Ditches locates <br />ditches and culverts especially in regard to final reclamation practices. <br />• The Lorencito Canyon Mine has been in Final Reclamation since 2002 (14 <br />years and two permit renewals). New Elk Coal Company expresses concern <br />as to why at this point in the reclamation/permit maintenance process this <br />revision would be requested by DRMS. Map 2.03-2 5 -Year Mine Plan is <br />the proposed five-year mine plan and not intended to show structures related <br />to fill design and construction and considering that the LCM permit is <br />restricted to "reclamation only" does not have relevance to current <br />operations. <br />Map 2.05.3-7 Culverts and Ditches was revised and submitted to DRMS in <br />2013. The current map numbering was not intended to reference Exhibit 15 <br />criteria but to provide an aid to identify maintenance issues arising during <br />field inspections. The numbers in no way reference design criteria in <br />Exhibit 15. <br />Digital files for 2.03 have already been submitted via email. Changes to pages <br />2.05-30 and 2.0530a are attached as is e form for a permit revision and the above <br />referenced ARR-2014 revision. Paper c pies are being submitted by Priority Mail. <br />Please contact me with any questions, <br />Regards, <br />Ron Thompson <br />Agent <br />