Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Load and Haul Spoil to West Pit (Subtract SL7 & SL8 vol.) <br />Site: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: Colorado <br />Date: 3/25/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat DI IT - I IU <br />-Dump Area: Cat DI IT - I IU <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: C019-009 <br />Shift basis: leer day <br />("act Rreakdnwn- Tnick/I.nader Team Sunnnrt F.auinment Maintenance Eouinment <br />Total work team cost/hour: $3.848.89 <br />MATERIAL OUANTITIES <br />Initial volume: 481,956 CCY Swell factor: 1.000 <br />Loose volume: 481,956 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,572 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 191.37 LCY <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$114.21 <br />$344.26 <br />$177.24 <br />$177.24 <br />$75.59 <br />$64.74 <br />Operating cost/hour: <br />$270.80 <br />$506.11 <br />$291.79 <br />$291.79 <br />$42.64 <br />$67.43 <br />Ripper op. costihour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />$38.89 <br />$38.89 <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$407.11 <br />$888.97 <br />$507.92 <br />$507.92 <br />$154.06 <br />$161.58 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,517.41 <br />Support: <br />$1,015.84 <br />Maint: <br />$315.64 <br />Total work team cost/hour: $3.848.89 <br />MATERIAL OUANTITIES <br />Initial volume: 481,956 CCY Swell factor: 1.000 <br />Loose volume: 481,956 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,572 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 191.37 LCY <br />