My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-12_PERMIT FILE - M2016081
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016081
>
2016-12-12_PERMIT FILE - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2020 6:08:11 AM
Creation date
12/13/2016 10:01:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
PERMIT FILE
Doc Date
12/12/2016
Doc Name
Application
From
AuPt Industries LLC
To
DRMS
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: April 1, 2017 and completion: Nov 1, 2018 <br /> 2) How many years is the mine anticipated to be operational: 2 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (E]) all-yearlong or(Zb seasonally, explain: April 1 - November 15 <br /> 4) How many aces of the mine site will be disturbed at any given time: 4 acres <br /> 5) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches _✓ _6-8 inches <br /> 8-10inches =10-12 inches <br /> Other: <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): (_ZL)Yes or(_a)No <br /> a. If yes,approximately how thick is the overburden? 1 feet <br /> 7) How will the mine be accessed: ( ✓L) existing roads (E) new roads will be created <br /> Please describe the existing roads: <br /> There—is a C,Irrenta road auto mono sit€, <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> No <br /> 8) Will water be needed during the mining operation (check one): (EL)Yes or(-a)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> A permitted well was drilled in September 2016. <br /> 9) Will any water diversions or impoundments be constructed (check one): (- )Yes or(-a)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> A dam feature from past working will be used as a pond This feature was permitted and <br /> bc)nripd with mrrPnt Prig Pn rting Permit <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or(]a)No <br /> a. If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.