Laserfiche WebLink
BLASTING MATERIALS QUANTITIES <br />Drilling Equipment - Drill: Atlas Capco DML/SP - 9-7/8" <br />-Drill Pad Preparation: Cat D11R - 11U <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery -Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: Cap Delivery Truck <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauinment Prenaration Sllnnort Sllnnort Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />764.76 <br />cubic yards <br />Total Quantity of Explosives Required: <br />628,332 <br />pounds <br />Total Quantity of det. cord/fuse/wire Required: <br />94,760 <br />linear feet <br />Quantity of Blasting Cas per Blasthole: <br />1 <br />ca (s) <br />Total Quantity of Blasting Caps Required: <br />1,085 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />1,085 <br />primers <br />Quantity of Delays per Blasthole: <br />I <br />dela (s) <br />Total Quantity of Delays Required: <br />1,090 <br />delays <br />HOURLY EQUIPMENT COST <br />Descrintinn <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DML/SP - 9-7/8" <br />-Drill Pad Preparation: Cat D11R - 11U <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery -Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: Cap Delivery Truck <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Eauinment Prenaration Sllnnort Sllnnort Bulk Truck Can Truck <br />Total work team cost/hour: $997.40 <br />MATERIALS COST <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />MiscTruck <br />MiscTruck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />100 <br />100 <br />Ownership cost/hour: <br />$86.05 <br />$126.54 <br />NA <br />NA <br />$67.53 <br />$5.42 <br />Operating cost/hour: <br />$173.42 <br />$280.92 <br />NA <br />NA <br />$83.47 <br />$18.73 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$62.43 <br />$37.41 <br />NA <br />NA <br />$27.73 <br />$27.73 <br />Unit Subtotals: <br />$321.90 <br />$444.88 <br />$0.00 <br />$0.00 <br />$178.73 <br />$51.89 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$321.90 <br />$444.88 <br />$0.00 <br />$0.00 <br />$178.73 <br />$51.89 <br />Total work team cost/hour: $997.40 <br />MATERIALS COST <br />Total Materials Cost: $289,636.76 <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />( 7,900-15,000 fps) <br />Pound <br />$0.234 <br />628332.240 <br />$147,029.74 <br />Cast primer, 1.0 lb <br />(electric or non -electric <br />Primers or Boosters: <br />system) <br />Each <br />$3.693 <br />1085.000 <br />$4,006.91 <br />Non -electric cap, delay <br />Blasting Caps: <br />non -electrics stems <br />Each <br />$3.489 <br />1085.000 <br />$3,785.57 <br />Det. Cord, fuse, or <br />Detonating cord, 25 gr./ft. <br />wire: <br />(non -electrics stems) <br />Linear foot <br />$0.140 <br />94760.050 <br />$13,266.41 <br />MS connectors (non - <br />Delays: <br />electrics stems) <br />Each <br />$4.914 <br />1090.000 <br />$5,356.26 <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing - <br />Miscellaneous: <br />imported) <br />Cu. yd. <br />$27.190 <br />764.758 <br />$20,793.77 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,733.00 <br />34.906 <br />$95,398.10 <br />Total Materials Cost: $289,636.76 <br />CIRCES Cost Estimating Software <br />