Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.900 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.426 <br />Altitude: <br />0.930 <br />Material Weight: <br />0.894 <br />Blade type: <br />1.000 <br />Net correction: 0.9742 <br />Adjusted unit production: 881.94 LCY/hr <br />Adjusted fleet production: 3527.76 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.541/LCY <br />Total job time: 141.43 Hours <br />Total job cost: $269,732.48 <br />Source <br />(AB.AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />