My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-19_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-10-19_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 11:51:45 AM
Creation date
12/13/2016 8:19:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/19/2016
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operator Cost/Hour: $37.41 NA <br />Total unit Cost/Hour: $461.35 <br />Total Fleet Cost/Hour: $1,845.40 <br />MATERIAL QUANTITIES <br />4 Dozer(s) <br />Initial Volume: <br />498,928 <br />Swell factor: <br />1.000 <br />Loose volume: <br />498,928 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 355 feet <br />Unadjusted hourly 905.3 LCY/hr <br />production: <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -20% <br />Average site altitude: <br />Material weight: <br />Weight description: <br />7,600 feet <br />2,900 lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />4 Dozer(s) <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.426 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.8641 <br />Adjusted unit production: 782.27 LCY/hr <br />Adjusted fleet production: 3129.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.590/LCY <br />Total job time: <br />159.45 Hours <br />Total job cost: <br />$294,246.63 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.