My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-03_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-10-03_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 7:30:25 AM
Creation date
12/13/2016 7:52:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/3/2016
Doc Name
Performance Standards
Section_Exhibit Name
Volume 15 Rule 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />distances, e.g. 200 ft. In this manner, "representation" from across the target reclamation unit is "forced" <br />rather than risking the chance that significant pockets are entirely missed, or overemphasized as often <br />occurs with simple random sampling. <br />Older reclaimed units (e.g., 7+ years) shall receive a minimum of 20 ground cover transects and in <br />monitoring areas — co -located shrub density belts. Production for monitoring purposes shall be collected <br />from a representative five of these 20 sample points. For bond release efforts, production will be <br />collected from a statistically adequate sample as defined below. Monitoring efforts for younger reclaimed <br />units (e.g., 2 to 4 years) shall receive 15 transects and co -located woody density belts (as necessary) but <br />no production sampling. First year units will receive one cluster of five emergent density quadrats spread <br />in a representative manner for approximately every two acres of reclamation. For units 50 acres or larger, <br />a five -quadrat cluster should be collected from every 4 acres of reclamation. With regard to any two-year <br />old or older reclamation unit that is smaller than about 3 acres, the number of samples (for monitoring) <br />shall be limited to five. <br />The systematic procedure for sample location in revegetated units shall occur in the following stepwise <br />manner. First, a fixed point of reference (e.g., fence corner) will be selected for the target unit to facilitate <br />location of the systematic grid in the field. Second, a systematic grid of appropriate dimensions will be <br />selected to provide a reasonable number of coordinate intersections (e.g., 5, 15, 20, etc.) that would then <br />be used for the set of sample sites. Third, a scaled representation of the grid will be overlain on a <br />computer-generated map of the target unit extending along north/south and east/west lines. Fourth, the <br />initial placement of this grid will be implemented by selection of two random numbers (an X and Y <br />distance) to be used for locating a systematic coordinate from the fixed point of reference, thereby making <br />the effort unbiased. Fifth, where an excess number of potential sample points (grid intersections) is <br />indicated by overlain maps, the excess may be randomly chosen for elimination. (If later determined that <br />additional samples are needed, the eliminated potential sample sites would be added back in reverse order <br />until enough samples can be collected.) Sixth, using a handheld compass and pacing techniques, or a <br />hand-held GPS, sample points will be located in the field. <br />Once a selected grid (sample) point is located in the field, sampling metrics will be utilized in a consistent <br />and uniform manner. In this regard, ground cover sampling transects will always be oriented in the <br />direction of the next site to be physically sampled to further limit any potential bias while facilitating <br />sampling efficiency. Depending on logistics, timing, and access points to a target sampling area, the field <br />crew may occasionally layout a set of points along coordinates in one direction and then sample them in <br />reverse order. However, orientation protocol will always be maintained (i.e. in the direction of the next <br />point to be physically sampled). If the boundary of an area is encountered before reaching the full length <br />of a transect, the transect orientation will be turned 900 in the appropriate direction so the transect will be <br />completed within the target unit. In this manner, edge transects will be retained entirely within the target <br />unit by "bouncing" off the boundaries. Production quadrats will always be oriented 900 to the right <br />(clockwise) of the ground cover transect and placed one meter from the starting point so as to avoid any <br />trampled vegetation. Woody plant density belts (for monitoring efforts) will be extended parallel to the <br />ground cover transects for a distance of 50 meters and width of 2 meters. (If the grid distance is less than <br />50 meters, density belts will be reconfigured to be 4 in X 25 in or similar configuration, but always <br />totaling 100 mz.) <br />Determination of Ground Cover <br />Ground cover at each sampling site will be determined utilizing the point -intercept methodology. This <br />methodology will be applied as follows: First, a transect 10 meters in length will be extended from the <br />starting point of each sample site toward the direction of the next site to be sampled. Then, at each one - <br />meter interval along the transect, a "laser point bar", "optical point bar" or 10 -point frame will be situated <br />Collom — Rule 4, Page 28 Revision Date: 4/18/16 <br />Revision No.: PR -04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.