My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-03_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-10-03_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 7:30:25 AM
Creation date
12/13/2016 7:52:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/3/2016
Doc Name
Performance Standards
Section_Exhibit Name
Volume 15 Rule 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />Where necessary, the regraded spoil surface will be roughened by ripping or discing etc., to ensure a bond <br />between the topsoil and spoil to reduce slippage and to allow vegetative root penetration. To date there is <br />no evidence of topsoil slippage on reclaimed areas in the existing permit area. A few small tension cracks <br />resulting from settling of fill and topsoil have occurred in a few areas within a year or two after <br />reclamation, but soon stabilize and begin to fill in. <br />The final surface as shown on the Post -mining Topography Map (Map 19C) will approximate the overall <br />pre -mining grades. Appropriate cross sections that show the anticipated final surface configuration of the <br />Collom mining area, in conjunction with the existing pre -mining topography, are shown on the Pre - <br />mining and Post -mining Cross Section (Map 20C). <br />The regrading plan reestablishes escape cover, south facing slopes for wintering big game populations <br />and small drainages suitable as future location of stockponds necessary to achieve the post -mining land <br />use. <br />Revegetation will commence as soon as the topsoil has been redistributed and prepared for seeding as <br />described in Section 2.05.4. The area will be seeded with the seed mixture described in Section 2.05.4 as <br />quickly as possible, typically in the fall of each year following topsoil placement activities. <br />4.14 BACKFILLING AND GRADING <br />4.14.1 General Requirements <br />The mining operations of Colowyo will not employ the use of contour mining methods. <br />The original permit demonstrates that Colowyo does not have thin or thick overburden as defined in <br />Subsection 4.14.4 or Subsection 4.14.5. <br />The mining plan, as described in Section 2.05.3, maximizes coal conservation and recovery while <br />minimizing adverse environmental impacts. Because of the mining configuration planned by Colowyo, <br />an exemption from the 180 day or four spoil ridge limitations has been formally requested. The mining <br />plan has been designed as a continuously -moving open pit operation with the mine advancing in the up <br />dip (north to south) direction. The mining operation will progress in a southward direction with <br />shovels/trucks proceeding along the entire length of the mining area (Map 23B). With the numerous <br />benches used in an open pit operation, the mine area will be opened for some time until the equipment <br />comes back to initiate another pass on a designated bench. <br />As the mining operations remove coal seams, the mining area must be left open until such time as the <br />lower-most coal seam can be recovered. With the mining configuration, the time differences between <br />mining the upper -most seam versus the lower-most seam may be greater than 180 days. As the operation <br />advances, backfilling will be as contemporaneous as practical but not so as to interfere with removal of <br />the lower-most coal seam. Colowyo will rough backfill and grade as shown on the Map 29B — Spoil <br />Grading. All disturbed areas may be returned to the appropriate final contour by grading and backfilling <br />with the use of a dragline, trucks, dozers, and scrapers. Additional detail of the backfilling and grading <br />for the mining operation is set forth in the discussion under Sections 2.05.3 and 2.05.4. <br />The area to be mined will be restored to a topography approximating pre -mining grades. The slopes of <br />backfilled areas, as necessary, will utilize contour furrows for erosion control and stability. These contour <br />furrows will be constructed according to the requirements outlined in Section 2.06.2. Where applicable, <br />Colowyo will retain all overburden and spoil on the solid portion of existing benches. The final graded <br />slopes will not exceed the approximate original pre -mining slope grade as shown on the Map 19C — Post <br />Mining Topography. Table 2.05.6-5 presents a mine -wide volumetric calculation in support of the Post <br />Collom — Rule 4, Page 16 Revision Date: 4/18/16 <br />Revision No.: PR -04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.