Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />e ,. .. ♦ � � .. � � ., � ,. i. ,... u. xl�G4'sb'�"c{.tc'_w'd+$t5'ti#S',sb�'sx.;,':c: '+i.'�:�,.'fiwS�w:: �' .. , <br />5. MJ -95-03 - Located in the Jubb Creek valley fill just downstream of the confluence of the West and East <br />Forks of Jubb Creek, this site represents the condition of the valley -fill aquifer downgradient of the proposed <br />Collom Pit. <br />6. Gossard Well — Located within alluvium beneath the rail loop, this site represents the condition of the valley <br />fill aquifer in the vicinity of the Gossard Coal Loadout Facility. <br />7. A-6 Well — Located in the Good Spring Creek alluvium, this site represents the condition up -gradient of <br />proposed and current mining activities. <br />8. North Good Spring Well — Located in the Good Spring Creek alluvium, this site represents the down -dip <br />condition below existing and proposed mining activities. <br />9. MT -95-02 — Located in the Taylor Creek valley fill, this site represents the down -dip condition below current <br />and proposed mining activities. <br />10. A-7 — Located in the West Fork of Good Spring Creek alluvium, this site represents a potential down -dip <br />condition below South Taylor mining activities. <br />11. A-8 - Located in the West Fork of Good Spring Creek alluvium, this site represents the condition up -gradient <br />of South Taylor mining activities. <br />12. Trout Creek Well — Located on the northeastern edge of the Collom Pit, this site represents the regional <br />aquifer condition of the Trout Creek Sandstone. <br />For the valley fill groundwater wells and one deep groundwater well, water levels and field water -quality <br />parameters (Temperature, Water Level, pH and Conductivity) will be measured quarterly; samples for <br />laboratory analysis will be collected annually during the second quarter utilizing the paramaters listed <br />below. <br />Annual Groundwater Laboratory Parameters <br />pH Conductivity at 25°C <br />Total Dissolved <br />Solids <br />+2)D <br />Bicarbonate (HCO3 -)° Calcium (Ca <br />Magnesium (Mg+2)° Ammonia (NH3) <br />Nitrate <br />Phosphate (PO4 as P) Sodium (Na+) <br />Sulfate (SO4) Arsenic (As) <br />Iron (Fe) <br />Lead (Pb) Manganese (Mn) <br />Mercury (Hg) Selenium (Se) <br />TD <br />Zinc (Zn) <br />D = Dissolved <br />TD = Total Dissolved <br />T = Total <br />TR = Total Recoverable <br />Prior to mining at Lower Wilson, the following three valley fill groundwater monitoring sites will be <br />added: <br />1. MW -95-01 — Located in the Wilson Creek alluvium, this site represents the upstream, <br />undisturbed background conditions of the valley fill aquifer. <br />2. MW -05-03 — Located in the Wilson Creek and unnamed drainage alluvium, this site <br />represents valley fill groundwater quality immediately downgradient from Lower Wilson. <br />3. MW -95-02 — Located in the Wilson Creek alluvium, this site represents the downgradient <br />conditions below Lower Wilson and the proposed haul road. <br />It is reasonable to expect potential future monitoring activities for the Lower Wilson locations to mirror <br />those for the existing operation as it pertains to frequency and specific parameters. <br />Groundwater Fill Piezometers - Monitoring of the Streeter Fill piezometer and Section 16 Fill piezometer <br />have been discontinued. The West Pit Fill and West Taylor Fill piezometers will be monitored quarterly <br />for water levels. One additional piezometers will be installed into the toe of East Taylor Fill, once <br />constructed, as described in Exhibit 21 Item 1. <br />Collom —Rule 4, Page 10 Revision Date: 9/1/16 <br />Revision No.: MR -161 <br />