Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />expansion area should be enhanced as compared to pre -mining condition based especially on increased <br />forage availability and diversity (for both livestock and wildlife species). <br />To date, reclamation efforts at the existing operation have proven successful. Herds of deer and elk are <br />regularly seen grazing on the reclaimed areas. Rodent and small game populations have reestablished on <br />the reclaimed areas providing a readily available food source for local raptor populations and other <br />predators. Columbian sharp -tailed grouse also use reclaimed grasslands. <br />4.19 PROTECTION OF UNDERGROUND MINING <br />Colowyo will conduct no coal mining closer than 500 feet to any point of either an active or abandoned <br />underground mine. Underground coal mines have been operated in the past as discussed in Section <br />2.04.4, but their locations were on the -northern side of Streeter Draw well over 500 feet from present <br />Colowyo mining. <br />The surface mining activities of Colowyo have been designed so as not to endanger any present or future <br />operations of either surface or underground mining operations. As discussed in Section 2.05.3, Colowyo <br />has engineered its mining plan to maximize recovery of coal by current economical surface mining <br />methods. <br />4.20 SUBSIDENCE CONTROL <br />Colowyo is conducting a surface coal mining operation. Therefore, the requirements of 4.20 are not <br />applicable to the Colowyo operation. <br />4.21 COAL EXPLORATION <br />All coal exploration activities within the Collom permit revision area will be completed in accordance <br />with the requirements and procedures outlined in the Volume 1. <br />4.22 CONCURRENT SURFACE AND UNDERGROUND MINING <br />Colowyo does not plan to have concurrent surface or underground mining activities; therefore, the <br />requirements of this Section are not applicable to this permit application. <br />4.23 AUGER AND HIGHWALL MINING <br />Colowyo does plan to conduct highwall mining activities; therefore, the requirements of this Section will <br />be revised through the technical revision process prior to initiating any highwall mining in the Collom <br />mining area. <br />4.24 OPERATIONS IN ALLUVIAL VALLEY FLOORS <br />The field investigation described in Section 2.04.7 and 2.06.8 resulted in no identification of alluvial <br />valley floors in the general mining area which would be adversely affected by mining operations; <br />therefore, no special performance standards for operations in the alluvial valley floors are applicable to <br />this mining permit application, and no protection or remedial measures are proposed for compliance to <br />this Section. <br />Collom — Rule 4, Page 34 Revision Date: 4/18/16 <br />Revision No.: PR -04 <br />