Laserfiche WebLink
Revised May 24, Sheet I was not certified by the Registered Professional Engineer, as required by Rule <br />2.10.3(2). Please submit a signed copy of the map........ <br />Response: Certified copies of Map 24 and any other maps that have been revised accompany these responses. <br />Cost Estimate <br />8. The Division has conducted a reclamation cost estimate for the proposed revision. The estimate is <br />attached please let the Division know if you concur with the cost estimate. <br />Response: We have reviewed the Division's cost estimate, and accept it as a reasonable representation of the <br />associated project reclamation costs. <br />