My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-08_REVISION - C1981013 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2016-12-08_REVISION - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 10:55:12 AM
Creation date
12/9/2016 8:12:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
12/8/2016
Doc Name
Cost Estimate Update
From
Tabetha Lynch
To
Robin Reilly
Type & Sequence
MT7
Email Name
RAR
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: MT7 review <br />Site: Golden Eagle Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/6/2016 County: Las Animas <br />User: TNL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981013 <br />Abbreviation: None <br />Filename: C013-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />Seal 6 Wells BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />36.00 <br />$23,205.21 <br />$6.00 <br />$4.00 <br />$1,059.00 <br />$1,943.00 <br />$488.00 <br />$1,899.00 <br />$2,926.00 <br />$837.00 <br />$674.00 <br />Regrade Areas Around Well Sealing DOZER <br />0.08 <br />Seed Well Sealing Pads REVEGE <br />0.10 <br />Mobilize Well Sealing Equipment MOBILIZE <br />3.30 <br />Replace Topsoil on NW Vent Fan Area TRUCKI <br />5.95 <br />Re rade Access Road to NW Vent Shaft DOZER <br />2.33 <br />Seed NW Vent Fan and Access Road REVEGE <br />1.55 <br />Mobilize Equipment for NW Vent Shaft MOBILIZE <br />Reclamation <br />3.50 <br />Re rade Access Road to S172 DOZER <br />4.00 <br />Seed Access Road to S172 REVEGE <br />1.00 <br />SUBTOTALS: <br />57.81 <br />$33,041 <br />INDIRECT COSTS <br />$667.43 <br />OVERHEAD AND PROFIT: <br />$346.93 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />28.90 <br />Profit: <br />10.00 <br />Total = <br />$667.43 <br />Total = <br />$346.93 <br />Total = <br />$2,152.47 <br />Total = <br />$3,304.10 <br />TOTAL O & P = <br />$6,470.93 <br />CONTRACT AMOUNT (direct + O & P) = <br />$39,511.93 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contractibid preparation: <br />0.00 <br />Total = $0.00 <br />Reclamation management and/or administration: <br />6.20 <br />$2,449.74 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $8,920.67 <br />TOTAL BOND AMOUNT (direct + indirect) = $41,961.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.