My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-08_REVISION - C1981013 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2016-12-08_REVISION - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 10:55:12 AM
Creation date
12/9/2016 8:12:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
12/8/2016
Doc Name
Cost Estimate Update
From
Tabetha Lynch
To
Robin Reilly
Type & Sequence
MT7
Email Name
RAR
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />TRINIDAD <br />Total one-way travel distance: <br />25.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$2,827.92 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$98.31 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): <br />0.63 0.63 <br />Return Time (Hours): <br />0.63 0.63 <br />Loading Time (Hours): <br />0.25 NA <br />Unloading Time (Hours): <br />0.25 NA <br />Subtotals: <br />1.75 1.25 <br />JOB TIME AND COST <br />Total job time: 3.50 Hours <br />Total job cost: $2,926 <br />
The URL can be used to link to this page
Your browser does not support the video tag.