Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil on NW Vent Fan Area <br />Site: Golden Eagle Mine Permit Action: MT7 Permit/Job#: C1981013 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 12/6/2016 County: Las Animas <br />User: TNL <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: CAT 928Hz <br />Abbreviation: None <br />Filename: 013 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />Cat D8T - 8SU <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Tnick/Loader Team Sunnort Fouinment Maintenance Fouinment <br />Total work team cost/hour: $326.61 <br />MATERIAL OUANTITIES <br />Initial volume: 694 CCY Swell factor: 1.215 <br />Loose volume: 843 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />45 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$14.02 <br />$18.81 <br />NA <br />$82.01 <br />NA <br />NA <br />Operating cost/hour: <br />$42.53 <br />$12.52 <br />NA <br />$79.23 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.60 <br />NA <br />$38.89 <br />NA <br />NA <br />Unit Subtotals: <br />$56.55 <br />$69.93 <br />NA <br />$200.13 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $126.48 <br />Support: $200.13 <br />Maint: $0.00 <br />Total work team cost/hour: $326.61 <br />MATERIAL OUANTITIES <br />Initial volume: 694 CCY Swell factor: 1.215 <br />Loose volume: 843 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />