Laserfiche WebLink
d2 CAD Consulting, LLC <br /> CCWRE <br /> EXHIBIT L <br /> RECLAMATION COSTS <br /> A significant portion of the area found in the original 2001 Permit has been either reclaimed, mitigated, <br /> or will remain in agricultural use, and has therefore been released from the Permit. The letter <br /> authorizing the reduction is attached. The 92.9-acre area remaining in the Permit is shown on Exhibits <br /> F-1 and F-1.1, Reclamation Plan, is owned by Loveland Ready Mix Concrete, Inc. (LRM) and Croissant <br /> Family Farms, LLC (CFF). The 48.0-acre area owned by LRM in which the existing batch plant and <br /> processing facilities are located is to remain in this post-mining use in perpetuity. On the 44.9-acre <br /> parcel owned by CFF, the remaining resource in Cell 4 will continue to be mined and concurrently <br /> reclaimed. <br /> This batch plant and sand and gravel mining and processin o cel has been established <br /> for about 15 years. Cells 1, 2, and 3 have been min ut Ime C and 2 are in continuing <br /> use as part of the batch plant and processi cilitil <br /> Ce h s e i d s a wildlife pond. The <br /> location of these areas and the cell s o in Ex nd 1 t' Plan. <br /> On the LRM property, w' t e pre ra ' as a water supply pond for the <br /> batch plant and proce si i it a to I led with processing fines and returned <br /> concrete. Given the L e esta 'shed n al land use as a concrete batch plant, ancillary <br /> facilities, and Cell 3 as a I e pasture, reclamation has essentially been completed. <br /> However, a pipeline cont c ma a caused a weed infestation on a small area between Cell 3 and <br /> Cell 4. The reclamation cos own in this exhibit include reclamation of this area, if necessary. <br /> The 44.9-acre area owned by CFF is leased by LRM and contains a sand and gravel pit (Cell 4) currently <br /> being mined and undergoing concurrent reclamation. Reclamation is being completed by in-house labor <br /> and equipment using on-site materials and is approximately 25%complete. Cell 4 will be reclaimed as a <br /> wildlife pond and pasture/rangeland. Once Cell 4 is depleted, no further mining is anticipated on this <br /> site. An estimate of the total reclamation costs for Cell 4 and the remaining CFF property is provided in <br /> Table L, Reclamation Costs. The estimate is for the remaining work to reclaim the CFF parcel and <br /> includes an allowance for reclamation of the potentially weed infested area east of Cell 3. A description <br /> of the seed mix to be used in reclamation is provided in Exhibit E. <br /> APPLICATION FOR AMENDMENT TO LOVELAND READY MIX CONCRETE,INC <br /> REGULAR 112 PERMIT NO.M-2001-022 GREEN/CROISSANT SAND AND GRAVEL MINE <br /> August,2016 21 OF 39 <br />