Laserfiche WebLink
(b) Non-approved Waste Rock Materials — Will remain in-place at the interim stockpile <br /> location. These materials are considered by VRI to constitute "ore" and as such are <br /> subject to future operational and processing plans. <br /> VRI will ensure that such materials remain adequately stabilized and/or contained in <br /> accordance with both this Plan and the facility/operation Stormwater Permit and <br /> Stormwater Management Plan requirements, to include peripheral berming, run-on <br /> controls, etc. <br /> 4.0 NON-REPAIR OPTION(S) <br /> While it is VRI's intent to remove all non-authorized materials from the EPF and gain recertification <br /> of same, VRI shall retain the right to make any determination as to the technical and/or economic <br /> viability of undertaking liner system repair and re-certification. <br /> In the event VRI determines that, for technical and/or economic reasons, liner system repair and <br /> recertification is non-viable, VRI shall in a timely manner develop a closure (or other alternative) <br /> plan and submit same to DRMS in the form of a separate Technical Revision or Permit <br /> Amendment, as may be warranted. <br /> 15 <br />