My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-07_REVISION - M2009076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009076
>
2016-12-07_REVISION - M2009076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:06 PM
Creation date
12/8/2016 8:16:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
REVISION
Doc Date
12/7/2016
Doc Name
Request for Technical Revision
From
Venture Resources Inc
To
DRMS
Type & Sequence
TR4
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
then return to the mucking platform for successive loads until all muck-ready material has been <br /> removed from the working platform; after which, the slope excavation process will be repeated. <br /> When the entirety of the composite liner system has been fully exposed (i.e., all significant <br /> quantities of loose material removed), manual "sweeping" and/or hand-held blower units may be <br /> employed (if necessary) to fine clean the topmost geotextile (drainage) layer component of the <br /> liner system. As warranted (and if determined feasible), a low ground pressure Bobcat mounted <br /> (or equivalent)rotary brush unit may also be utilized in order to expose areas for visual inspection. <br /> Residual materials derived from this action will be similarly pushed downslope to the mucking <br /> platform for retrieval and transport to the stockpile. <br /> The working platform area would then be removed from within the EPF via a retreating method, <br /> first removing the individual platform panels, followed by backhoe excavation (smooth-edge <br /> bucket) with direct loading to the rubber-tired front end loader bucket (or dump truck unit) for <br /> direct tram to the stockpile location. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.