Laserfiche WebLink
This mine is in reclamation and dose not operate more than 180 days a year as a mine. <br /> Reclamation is being conducted as time permits by the tour staff. <br /> 6. Has this mine been granted: <br /> a) Approval of TEMPORARY CESSATION Status? <br /> This mine site has not been granted approval for Temporary Cessation. <br /> b) Approval for INTERMITTENT OPERATION? <br /> This mine site has not been granted approval for Intermittent Operation and at this <br /> time we feel we no longer need to become an intermittent operation since we are <br /> reclaiming the site. <br /> 7. Number of acres currently affected (mining+ incomplete and or unreleased <br /> reclamation). <br /> M <br /> The total acreage of affected land by the Phoenix Mine activities is 0.447 Acres <br /> 8. Number of acres that were newly affected during the current report year. <br /> No new lands were affected this year at the Phoenix mine site. All excavation from <br /> mining activities during the past years have been placed in dry underground openings. <br /> 9. Number of acres that were reclaimed during the current report year. <br /> All of the 0.447 acres are being reclaimed. The entire area is in the process of being <br /> reclaimed but no part of it is totally reclaimed. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> No new land is planned to be disturbed in the coming year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> The entire 0.447 acres will be reclaimed this next year. <br /> 12.Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres backfilled: <br /> Total acres seeded w/approved mix: <br />