Laserfiche WebLink
Mobilization Worksheet Cont'd <br />Task # SRO 1B <br />Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DELTA <br />Total one-way travel distance: <br />5.00 miles <br />Average Travel Speed: <br />35.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$2,470.68 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$4.17 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equi ment E ui ment <br />Haul Time (Hours):0.14 <br />0.14 <br />Return Time (Hours): <br />............................ <br />0.14 0.14 <br />Loading Time (Hours): <br />0.50 NA <br />Unloading Time (Hours): <br />0.50 NA <br />Subtotals: <br />1.29 0.29 <br />JOB TIME AND COST <br />Total job time: 2.57 Hours <br />Total job cost: $2,475 <br />CIRCES Cost Estimating Software <br />