My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-01_HYDROLOGY - C1981010
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981010
>
2016-12-01_HYDROLOGY - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2016 8:18:49 AM
Creation date
12/2/2016 7:21:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Hydrology
Doc Date
12/1/2016
Doc Name
Quarterly Sediment Pond/Impoundment Report
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2016
Report Quarter_Month
4
Permit Index Doc Type
Sediment Pond Inspections
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE: 118.7 <br />INSPECTOR: <br />DRAINAGE: NO NAME <br />4th QUARTER 2016 <br />TRAPPER MINING INC. <br />QUARTERLY SEDIMENT POND INSPECTION REPORT <br />SIGNATURE: � &4A <br />DATE OF INSPECTION://—/ <br />POND IDENTIFICATION No Name #2 <br />No Name #4 <br />No Name #5 <br />Approximate water level: <br />Sediment level (% total storage): <br />p <br />�- <br />Outflow (cfs): / <br />Sediment marker (install or replace) <br />Identification sign (install or replace) <br />EROSIONAL: <br />Rills and/or gullies on downstream face. <br />Rills and/or gullies on upstream face. <br />Inadequate vegetation. chi <br />Outlet channel erosion. <br />' <br />Burrows. <br />Erosion of toe.JVIV <br />Water impounded against downstream toe. k67 <br />ALI <br />Other. <br />STRUCTURAL: -, <br />oe <br />Differential settling., <br />Cracks, slides, or scarps. <br />Seepage (specify location, color, value). <br />Defective spillways. <br />Other. — <br />APPURTENANTSTRUCTURES: <br />Defective spillways. v <br />0 <br />Dewatering device clogged. <br />Cracking or crushing of pipes.dz <br />Other. <br />COMMENTS: <br />#2: use riser/siphon tube as sediment marker; siphon top = 66%, <br />#4: use riser/siphon tube as sediment marker; siphon top = 75%, <br />#5: 60% level = top of post - 4.5'. <br />bottom = 50%. <br />bottom = 60%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.