Laserfiche WebLink
ATTACHMENT A <br />From:  "Procedures for Determining Peak Flows in Colorado" (SCS March 1984) <br />Runoff, Q = (P‐0.2S)2/(P+0.8S)SCS Curve Number: Potential maximum retention after runoff begins, S <br />100‐Yr, 24‐Hr Precip.: CN = 90 S = (1000/CN) ‐ 10 = 1.11 inches <br />P = 3.5 inches Q = 2.45 inches <br />Unit Discharge from Figure S‐1A above:89 cfs/in Therefore, Peak Flow (Qp) = 217.9 cfs <br />100‐Yr, 24‐Hr Precip.: CN = 70 S = (1000/CN) ‐ 10 = 4.29 inches <br />P = 3.5 inches Q = 1.01 inches <br />Unit Discharge from Figure S‐1A above:65 cfs/in Therefore, Peak Flow (Qp) = 65.5 cfs <br />89 cfs per  <br />inch of  <br />runoff <br />65 cfs per  <br />inch of  <br />runoff <br />C:\Users\tc1\Documents\Projects\_Teller\M‐1980‐244 CC‐V\TR‐86 Globe Hill SW Div\PeakFlowCheck.xlsx // PeakFlowsInColorado