My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-01_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2016-12-01_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2016 12:54:21 PM
Creation date
12/1/2016 1:35:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
12/1/2016
Doc Name
Cost Estimate
From
Clayton Wein
To
Leigh Simmons
Type & Sequence
TR140
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Regrade Light-Use Roads for Drill Pads Relocated in TR-140 <br />Site: West Elk Mine Permit Action: TR140 Permit/Job#: C1980007 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 11/29/2016 County: Gunnison Filename: C007-001 <br />User: CCW <br />Agency or organization name : DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown : <br /> Utilization % <br />Ownership Cost/Hour: $97.48 NA <br />Operating Cost/Hour: $103.60 100 <br />Ripper own. <br />Cost/Hour: $10.74 NA <br />Ripper op. Cost/Hour: $6.60 100 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $257.31 <br />Total Fleet Cost/Hour: $257.31 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 2,415 <br />Swell factor: 1.125 <br />Loose volume: 2,717 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 125 feet <br />Unadjusted hourly <br />production: <br />1,055.6 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />10 % <br />Average site altitude: 8,000 feet <br /> <br />Material weight: 2,650 lbs/LCY <br /> <br />Weight description: Decomposed rock - 25% Rock, 75% Earth
The URL can be used to link to this page
Your browser does not support the video tag.