Laserfiche WebLink
McAtee Construction Company Harley Pit #1 <br /> Permit# M-1986-147 2016 Annual Report <br /> Notes: <br /> Please refer to the 2016 Annual Report Map for location of the areas of disturbance in the mine. <br /> We continued to remove material from stockpiles and the mined area. No reclamation is required <br /> at this time. The markings and colors noted in the text reference areas shown on the map. <br /> (8) Approximately 0.59 acres was stripped this year. <br /> (9) The partially reclaimed areas continue to be monitor and area growing as expected. <br /> (10)Mining will continue on the mine face and we mined approximately 2.0 acres of the stripped <br /> area this year. We may strip an addition area, if needed,south of the current mining face <br /> (11) No reclamation is required next year, but we will resoil and seed any area that become ready <br /> for reclamation. <br /> (13) Weed control was done in June 2016 this year in accordance with the Weed Management Plan <br /> on the perimeter of the mine and spot work was done on the mine floor areas and roadways. Escort <br /> and 2-4-D was applied as needed. Weed control will continue in 2017. <br /> (18)The current bond is $71,755. Comparison of current disturbance with the evaluation done in <br /> 2010 found the bond to be adequate. This annual report shows that less area is disturbed at this <br /> time than allowed in the bond estimate. Reclamation is complete on 4.78 acres±of the site and <br /> have 3.64 ac seeded. We feel the bond is adequate to cover all reclamation requirements for this <br /> year. <br />